Saturday, September 25, 2010

Construction Updates - September 24, 2010

View looking west of great room



















View from the existing patio
Note tree stump for jumping and ER visits













The basement with lots of glass








View from the great room! Love those mountains!

Saturday, September 18, 2010





































Construction updates

The framing began on September 8 and the floor deck was to be delivered on September 13. Anyone at the cabin in the next 2 weeks will see plenty of action. We met with Skip on the 11th to finalize more 'things'. Skip still says that he thinks he will be done by Thanksgiving, we think Christmas. We picked out a natural cedar stain, indoor trim color and shingles. The water line was troublesome for our cabin , and we're still not sure of the costs on it. Enjoy the pictures.....