Sunday, October 31, 2010

October 30 - Old cabin updates
















Kevin, Marisa, Tyler, Matt, Big Jim and Rose, and I finished up the work at the cabin yesterday. More stuff to the trash and Goodwill plus renting a storage unit to put everything else into to wait for the new cabin. Demolition of some sort will begin shortly. The fire department is going to use the old cabin for training (not burning though). Skip want to get the cabin down before the snow starts because there is obviously grading to do on the site. So here are some final indoor shots of the cabin.

Sunday, October 17, 2010

October 16, 2010 updates











Lots of glass! All of the windows are in now. Plumbing and electrical in process now. The gorgeous view continues! We may have to cut down the stump in front. We had left it for a place for grandkids to jump from. In the photo to the right, those are the concrete piers for the west deck. Remember that deck will be both covered and uncovered


In the picture above on the left, that's the kitchen/morning sun deck

Sunday, October 10, 2010

Construction - October 10, 2010










West view. The deck to the west hasn't been built yet.












Great Room....windows to the west and entry in the middle. One bedroom to the left







The east side of the cabin. Bedroom window to the back, kitchen window, and morning deck off of great room.












The view from the great room.....Love it!













The opening to the left are the sliding glass doors onto the morning deck. The kitchen window is to the right.






































































































































































The basement is to the right.......bathroom in back left corner

Saturday, September 25, 2010

Construction Updates - September 24, 2010

View looking west of great room



















View from the existing patio
Note tree stump for jumping and ER visits













The basement with lots of glass








View from the great room! Love those mountains!

Saturday, September 18, 2010





































Construction updates

The framing began on September 8 and the floor deck was to be delivered on September 13. Anyone at the cabin in the next 2 weeks will see plenty of action. We met with Skip on the 11th to finalize more 'things'. Skip still says that he thinks he will be done by Thanksgiving, we think Christmas. We picked out a natural cedar stain, indoor trim color and shingles. The water line was troublesome for our cabin , and we're still not sure of the costs on it. Enjoy the pictures.....