Tuesday, July 27, 2010

Updates July 27

As you can tell, lots of 'stuff' going on at the cabin. The concrete was to be poured on Monday, July 26. On the previous Saturday Doug, Judy, Randy and I picked out plumbing fixtures, decking (Evergrain brand.....a sample is on top of the fireplace), lighting fixtures (there aren't many since we are using a lot of cans), carpet (bedrooms, basement and stairs to the basement), wood floor (oak), entry tile, and bathroom tile. For the next couple of weeks there is going to be a lot of site work (grading, working on Kansas Avenue, working with drainage, septic system, etc.). Framing is schedule to start on August 16. Here is a link to the cabinets. We had picked those out a couple of weeks ago, but forgot to add to the site. http://www.aristokraft.com/styles/product_detail/?id=333